Building new floating docks

June 9, 2016,

Scott has started building the new floating docks. We will be building 100′ of new floating docks this Spring.
Scott always takes his time with the first section so he can determine the best method for building quality docks  as well as determining the most efficient method to build them.
That’s the “product developer” in him.  He’s forever looking at things and telling me how with a few changes the product would be much better quality or how the manufacturer could save money producing the product.

June 9, 2016

Tags: ,

No comments yet. Be the first!

Leave a Reply

Get in touch